FACTS AND FIGURES
    Corel Centre Facts & Figures - During Construction
  • Six-acre excavation
  • 23,000 cubic metres of structural concrete (weighing 76,000 tonnes)
  • 1,100 steel pilings
  • 2,750 tons of reinforcing steel
  • 2,400 tons of structural steel
  • 250 interlocking precast concrete exterior blocks with roman motif - 27,000 pounds each
  • 108,000 square feet of metal siding
  • 500,000 concrete blocks
  • 43 kilometres of piping (heating, plumbing and sprinkler) - enough to stretch from Kanata to Arnprior!
  • 2,500 kilometres of wiring
  • 11 acres of drywall
  • 3,800 square yards of glass, with 75 tons of glass at main entrance (360 panels)
  • 5 acre roof
  • 34 roof trusses - weighing up to 105 tons each, each spanning 350 feet
  • 22 kilometres of steel refrigeration piping (for rink)
  • 300 cubic metres of concrete for rink slab - 6" thick. Only 3/16" variance allowed from one end to the other!
  • 83,000 square feet of interlocking paving - 375,000 individual paving stones!
  • 600 new trees (ash, linden, Austrian pine, Colorado spruce, English oak and Shubert chokecherry) and 1 1/4 miles of cedar hedge
  • 20,000 square yards of sod
  • 4 "fish hotels" in the adjacent Carp River
  • 17 miles of yellow lines in parking lots - 6,500 spaces and 70 bus spaces
  • 18,000 metric tonnes of asphalt on interchange ramps and road
  • over 500 workers at the site during peak construction
  • 2800 person years of labour during construction
  • construction completed six months ahead of original schedule